On this particular mission, the snowblower s progress is hindered due to the considerable height of the snow wall. The snowblower actually derailed a couple of times on this strip, which meant a heavy crane had to be brought in so that the train could be put back on tracks a very difficult and costful operation. Filmed on the Romanian railways, during winter 12.