1939 Ford Junkyard Hot Rod Revival Ep. 14
In the last few episodes we have painted the frame, and prepped the suspension for paint. Now that everything is ready Matt lays down some Eastwood Rust Encapsulator Plus and 2k Ceramic Chassis Black on the suspension pieces to match the frame. Once dried Matt and the crew work on assembling the front and rear suspension including the Old Yankee Speed Co reverse eye main leaf. Now that the car is back together as a roller we can work on getting brake lines run, fuel system sorted, and install the engine and
|
|