Kölner Dom Demontage des 2. Hängegerüst Cologne Cathedral Scaffolding Part 2 Finale
English, Deutsch. In part 2 you can see the remove of the big hanging scaffold in sextuple speed, accompanied by music of Goldman Cologne. Title: Les Fade Album: On The Outside (Looking In) Stefan Krachten: drums Dirk Herweg: Only the very best for the Cologne remove a 33 meter high and 25 tonnes heavy suspended aluminum scaffold in three parts from the north tower, a brandnew and second largest mobile crane of the world from Liebherr is called into action the LTM The 750 tonnes (loading capacity) gigacrane was assembled on July 21, 2013 beginning on Sunday morning at with a little break, until Monday morning, July 22, 2013, at in perfect teamwork by the Wasel company from Cologne, Bergheim. For the supports of the crane, foundations had to be cast into the station s forecourt. Operating weight of the mobile crane: 108 tonnes complete ballast (counter weight) 204 tonnes. The biggest mobile crane worldwide the LTM 11200 also built b
|
|