ep48 Boat maintenance Herrington Harbour North ( MD) Hallberg Rassy 54 Cloudy Bay Nov 2018
s, v Cloudy Bay (HallbergRassy 54) leaves Edgewater near Annapolis to have 3 weeks of boat maintenance in the boatyard at Herrington Harbour North. The key objectives were to repair the collision damage on the bow, gunwale, keel and rudder, new antifowl and lots of other jobs on the list. Not all goes to plan but we do complete the following: Repair to gel coat and teak gunwale Repair to the keel and rudder Polishing and applying Ceramic Pro to the hull and topsides Servicing the Side Power bow thruster inside and out Servicing the 26 folding Gori propeller Re newing the Cutlass bearing Adjusting the stern gland Servicing various raw water fittings in the engine room Fixing leaks under the water heater Servicing the genoa and cutter hydraulic Furlex, upper and lower units Improving and servicing the Selden gooseneck and the boom and mast vang fittings Rig inspection and repair to cutter halyard Making chocks for the R134 gas bottle
|
|