Orange Train Lahore, Metro Train Travel in Lahore, Sheikh Baig studio
Notable FEATURES OF PROJECT Length KM (Cut and Cover Section 1. 72 KM; Elevated 25. 4 KM) Elevated Viaduct U Shape Girders Stations 26 (Elevated 24; Underground 2) Rolling Stock 27 Train sets ( 5 Cars, train set135) Depot at Dera Gujran (Operation Control Center, workshops with the overhauling facility, training center, parking facility) Stabling Yard at Ali Town (Washing facility, minor repair facility, parking facility) Travelers from the Orange Line will have the option to utilize An
|
|