Giga Berlin, 2020 05 19, Pile driver at work
Today the pile driver at the Tesla Gigafactory Berlin construction site started it s work. It was pretty fast. I m sure the all piles they ve prepared last week are already in the ground by now. I don t know if they need more piles than that. The original plans didn t include piles at all. Yesterday they started to draw some lines with an excavator. My first thought was that it might be the locations of the escape tunnels, because in the early documents the tunnels looked very much like this. Today I think
|
|