Installation and Operation Process of Integrated Prefabricated Pumping Station
Installation and Operation Process of Integrated Prefabricated Pumping Station Make a good plan for construction area in advance Excavation slab and outlet connecting platform Make sure the bottom platform is flat Prelaying 100mm thick gravel layer at the bottom Put in the prebundled steel mesh Preinsert eight PVC pipes and inject them with concrete Mounting anchor bolt Use a crane or other lifting equipment to hoist the pump Use screws to secure the pull tabs and anchor bolts Inject concrete into the bottom of the cylinder Install the inlet flange to the pump inlet and connect the inlet Pumping station backfill Install the crushing grille (wet and dry explosionproof motor) Install the sewage pump at the bottom Install the outlet flange and connect the outlet pipe Application: River and lake water purification and circulation Collection and transportation of rainwater in lowlying areas of urban areas Rainwater pollution collection and
|
|