The cranes around the gigafactory 3 have left, indicating that internal equipment is in place. Distance test production is getting closer. The level of the ground and the piling area are very large, and the second building is likely to be very large. Let us wait and see.
0
0
Related videos
Preparing
To view the site materials you should be more than or equal to 18 years old